sash/ BLOG
← sash.liveRequest a benchmark

blog · field notes on drawing review

What the set gets wrong.

Cross-sheet contradictions, revision drift, regulators that stopped accepting assertion as evidence — and what a defensible review record looks like.

21 JUL 2026·3 MIN#drawing-review#coordination

The two-sheet problem

Drawing sets don't fail one sheet at a time. The expensive mistakes live between sheets — and cross-referencing them doesn't scale with headcount.

READ→
20 JUL 2026·3 MIN#building-safety-act#gateway-2

Gateway 2 is a documentation problem wearing a safety costume

The Building Safety Act's hard stop isn't failing designs on safety — it's failing submissions on evidence. Review findings without cited sources don't survive it.

READ→
sashAI PLAN REVIEW — FIRST PASS, NEVER A BLUFF
sign incontact© 2026